As of April 2005 we have installed the engine bearers, the engine room & lazerette have been given a final coat of paint (1 more epoxy coat then a high build epoxy primer follow by a high gloss epoxy finish to aid in cleaning.)

           

May 7 - 05 ... Pictures below show 4 of the tanks (2 water & 2 Diesel) installed into the engine room area.

       

May 7 - 05 ... The front section of the boat is also coming together well. Anchor locker & bulkhead have been fitted and await installation.

   

 

This is our first thru hull hole drilled in the hull for the anchor well drain. There are 3 layers of ply glued together to form the hull & the glue lines between each look good

 

These pictures give an overall sense of what the inside of the boat looks like at this stage.