We have started on the lead mould on the second of January. A small excavator was used to dig a trench at the rear of the boatshed. We then poured a concrete mix around the foam plug to create the mould.
We also have started installing deck beams as you can see below. Also a few internal pics as well.
Our access stairs installed at the stern, Props & Tankage shown below.
Engine Bearer being prepared for installation. |